Preserve the registered property description, survey and layout records, and dated evidence of the construction before the site changes further. Do not move a boundary marker, demolish the work or force entry to prove your point. If construction may cross your land, have the boundary identified professionally and obtain advice promptly about interim protection.
A wall on the ground and a line in a deed are not always the same line. Your first task is to connect the title schedule to identifiable land. A court considering restraint will need a clear claim to the affected strip and evidence of what the neighbour is actually doing.
Which documents identify the disputed boundary?
Collect the registered sale deed and its complete schedule, earlier deeds needed to explain the description, approved layout and available survey sketch. Record the survey number, subdivision, site number, measurements and adjoining boundaries. If different records conflict, put every version before the professional reviewing them. Do not choose only the one with the largest measurement.
Get available certified records through the appropriate authority rather than relying only on a broker's sketch. Section 21 of the Registration Act requires a description sufficient to identify immovable property in a non-testamentary document. That requirement explains why a vague handwritten site number is a poor starting point. It does not mean registration conclusively settles every later boundary dispute.
- Registered deed and full property schedule.
- Available survey, subdivision and approved layout records.
- Building approval and plan relevant to the disputed work.
- Dated photographs, earlier boundary images and written communications.
- Professional measurement notes identifying the reference points used.
How should I photograph the work?
Take clear, dated photographs from places you may lawfully access. Include wider views linking the disputed construction to stable landmarks, then closer views showing excavation, columns, walls or markers. Preserve the original files and metadata. A close-up of a brick wall without a location reference may prove very little about which property it occupies.
Make a short dated record of the work observed and its progress. Preserve earlier pictures of the same area, if you have them, without editing them to suggest a boundary they did not record. Note who took each image and where they stood. Do not enter the neighbour's premises, interfere with workers or fly equipment over private areas merely to improve the evidence.
Should I obtain a survey before approaching court?
A competent measurement can clarify the disagreement, but do not wait through irreversible construction solely to assemble a perfect file. Give counsel the material already available and the urgency. Ask which official or professional survey route fits the land and whether protective relief should be sought while the measurements are resolved.
Tell the surveyor about the disagreement and supply the complete documents. Ask them to identify reference points, method, dimensions and any limitation in the records. A sketch drawn only from your instructions is not equivalent to an independent identification of the boundary. If the neighbour will participate, arrange that accurately and record attendance without describing a failed discussion as agreement.
What should I say to the neighbour?
Identify the disputed location and the documents you rely on, request that the affected work pause pending verification, and propose a documented measurement. Keep the communication factual. Do not state that the neighbour is a criminal or has forged documents merely because your understanding of the line differs.
Keep their response and any plans or measurements supplied. If there is no response, preserve evidence of delivery without treating silence as acceptance of your boundary. Avoid signing a site-meeting note that calls a temporary mark the agreed boundary unless that is truly what you intend. A practical discussion can become evidence about what each side accepted.
What court protection may be available?
Order XXXIX Rules 1 and 2 CPC provide for temporary injunctions in their stated circumstances, including protection where property in dispute is in danger and restraint concerning injury. Counsel must identify the right suit, parties and relief and present the factual grounds. Construction next door does not by itself guarantee a stay.
Section 38 of the Specific Relief Act addresses perpetual injunctions to prevent breach of an obligation, including specified interference with property rights. The appropriate final relief may differ if encroachment has already occurred, possession was lost or title is contested. Describe those facts precisely. The court should not be asked to decide a narrow setback violation when the real claim concerns ownership of a strip of land.
Can a building complaint settle the boundary?
A complaint about construction contrary to an approved plan should identify the approval and the deviation you can substantiate. It can be useful to obtain the sanctioned plan and the authority's response. But an administrative building complaint should not be assumed to adjudicate your private title or restore possession.
Keep the two issues separate in the file: where the legal boundary lies and whether the building complies with its approval. The answer on an unapproved layout and the property due-diligence checklist provide related context. Neither replaces identification of your particular land.
My priority would be a small, usable evidence bundle: the complete deed schedule, the relevant plan, a location map, dated photographs and a chronology of the work. That gives counsel something concrete to plead and a surveyor something concrete to measure. Escalate urgency as the work progresses, while preserving a lawful record of what has changed.