You can bring a consumer complaint against the interior designer's company for the cost of putting the work right, with compensation and costs, or for a refund where the work is beyond use. On 3 September 2026, Hyderabad's District Consumer Disputes Redressal Commission-I, in Telangana, held that an interiors company which took payment on approved 3D renders, then built to different "production drawings" without first telling the customer that the renders were only for visual reference, was guilty of deficiency in service and an unfair trade practice. It awarded the homeowner's Rs 3.5 lakh rectification estimate, not a refund of the price.
Part of the consumer protection practice at S Jain & Attorneys, Bangalore.
This guide is for a Bengaluru flat owner who paid an interiors company in full, often Rs 10 to 15 lakh, on approved 3D designs, and now has units in the wrong finish, some missing and a completion date long past. Both 2026 orders discussed here come from outside Karnataka, and the second, against Livspace, was passed ex parte. They illustrate how Commissions decide such complaints but do not bind one in Bengaluru, and the Karnataka route is set out below.
| Question | District Commission-I, Hyderabad (Telangana), 3 September 2026 | Maharashtra State Commission, Mumbai, 5 November 2026 |
|---|---|---|
| Price paid | About Rs 12.75 lakh, all of it before the work began | Rs 71,62,004 |
| What was delivered | Units built to production drawings that differed from the renders, work incomplete | Cheaper materials, unsafe workmanship and an unfinished flat |
| Did the company defend? | Yes. Two of the three opposite parties contested | No. Heard ex parte from 30 July 2025 |
| What was ordered | Rs 3.5 lakh for rectification, with 9 percent interest from filing if unpaid within 45 days, Rs 50,000 compensation and Rs 25,000 costs | Refund of Rs 71,62,004 with 9 percent simple interest from 1 September 2024, Rs 1 lakh compensation and Rs 50,000 costs |
Test your own facts against three findings in the Hyderabad order.
Paid on the renders
She approved the 3D renders and paid on them, and the company took a Rs 6.1 lakh advance before sending its production drawings.
Illustrative only, too late
The company called the renders merely illustrative only after she complained, with no document showing she had been told earlier.
Her estimate set the award
With no figure from the company for completing the work, her rectification estimate was taken as correct and Rs 3.5 lakh awarded on it.
Can we file a consumer complaint against an interior designer or interiors company?
Yes, if you hired the company for your own home. The Consumer Protection Act, 2019 counts as a consumer, in section 2(7), anyone who "hires or avails of any service" for consideration, other than for a commercial purpose, and section 2(42) covers "service of any description". The Maharashtra State Commission held that a homeowner who hired interior design, procurement, civil and electrical work and a modular kitchen for his own flat was a consumer, because renovating your own home is private use.
Deficiency, under section 2(11), is "any fault, imperfection, shortcoming or inadequacy in the quality, nature and manner of performance" that a provider has undertaken to perform under a contract or otherwise, and the definition expressly includes "deliberate withholding of relevant information". On our reading, a company that knows its factory will build from drawings that differ from your approved renders, and does not say so, may fall within that limb. The complaint lies against the company even if the designer has gone: in Hyderabad, Interior Company by Square Yards and SY Interior Pvt Ltd were held jointly and severally liable.
The company says the 3D designs were only illustrative and its production drawings govern: who is right?
On the Hyderabad reasoning, it turns on what you were told before you paid. The company said the renders were "merely illustrative and conceptive in nature" and that the homeowner had approved the production drawings when she signed the contract. Its e-mail of 5 July 2024 said "the supply of the material and installation of the same will be done as per the production drawings", and that any difference raised before sign-off would have been fixed in the drawings.
The Commission rejected this on the evidence. She had approved and paid on the renders, the company collected Rs 6.1 lakh before sharing the e-sign document with the production drawings almost a month later, and nothing showed she was told the renders were only for visual reference until she complained. Where approval and the advance were given on the renders, the Commission asked "how can the execution be based on production drawings without intimating that the production drawings shall be final", and held that taking the money without that disclosure was a breach of trust, a deficiency in service and an unfair trade practice. A website clause on pre-conditions for on-time delivery did not apply, since none of its conditions existed in her case.
Two cautions. Section 2(47)(i) also counts as an unfair trade practice a statement "by visible representation including by means of electronic record" that falsely represents the standard, quality or grade of goods or services. On our reading a render used to win the order can be one, though neither order relies on those words. And if your paperwork said plainly, before you paid, that production drawings govern, expect the company to rely on it.
Key takeaway. In Hyderabad the dates decided it: approval and payment on the renders came first, the "merely illustrative" explanation after the complaint. Put your approvals, payments and the documents you received in date order before writing to anyone.
What did the Hyderabad District Commission order in September 2026?
Money to put the work right, not a refund and not an order to finish the job. The homeowner, from Secunderabad, paid an advance of Rs 6.1 lakh on 30 December 2023 and the balance on 8 March 2024 against a quotation of about Rs 12.75 lakh, and an extract from the company's website gave 3 March 2024 as the expected completion date. She listed mismatches in the rolling shutters, frosted glass, cabinet colours and fittings, kitchen units, crockery unit and TV unit. Her legal notice of 20 January 2025 asked for completion within seven days.
She sought completion to the renders, Rs 500 a day for the delay under the company's website terms, Rs 2 lakh for covering up defects and Rs 4 lakh for mental agony. Finding the work incomplete and unlike the renders, the Commission said that although "the deficiency in service is writ at large", "the execution of work cannot be lost sight of", and allowed the complaint in part: Rs 3,50,000 on her rectification estimate, Rs 50,000 compensation and Rs 25,000 costs within 45 days, jointly and severally, with 9 percent a year from filing on the Rs 3,50,000 if unpaid. At the time of writing, no appeal against it had been reported. Section 41 allows one to the Telangana State Commission within 45 days, or later on sufficient cause, only after the company deposits half the amount ordered.
What did the Maharashtra State Commission order against Livspace, and why does "ex parte" matter?
A full refund with interest, in a case the company never defended. A Mumbai homeowner paid Livspace India Private Limited Rs 71,62,004 to design and renovate his flat in 90 to 120 days, with handover due on 1 July 2024 and then 1 September 2024. His complaint said the designers changed without notice, cheaper materials replaced those promised, live wires were left uninsulated, a kitchen shutter fell on a family member and the flat was left incomplete.
Livspace did not appear even after notice by newspaper publication, so the Commission proceeded ex parte from 30 July 2025, deciding on the homeowner's evidence alone as section 38(3)(b)(ii), applied by section 49(1), allows. In its order of 5 November 2026 in Consumer Complaint No. SC/27/CC/23/2025 it held the delay a deficiency in service, called the use of "low-grade HDHMR instead of BWP/BWR plywood" and a cheaper shutter range a "bait-and-switch tactic" and an unfair trade practice, and held the unrebutted assertions "stand legally proven". It ordered a refund of Rs 71,62,004 with 9 percent simple interest from 1 September 2024, not the 18 percent claimed, plus Rs 1 lakh compensation and Rs 50,000 costs.
Treat it as an illustration, not settled law: the company was never heard and nothing was tested. Section 51(1) allows thirty days to appeal to the National Commission, section 51(5) lets an appeal lie even from an ex parte order, and at the time of writing that period had not run out. The order is also silent on the fittings left in the flat, a point we would expect a defending company to raise.
Common mistake. Treating the Livspace order as the measure of every claim. It was decided without the company's side, on work the order describes as unsafe and unfinished. Where the work was carried out but is not what you approved, the contested Hyderabad order measured the claim by the cost of putting it right.
Refund, completion or the cost of putting it right: what can we claim?
Section 39(1) lets the Commission order one or more of these: removal of the deficiencies in the service under clause (f), return of the charges paid with interest under clause (c), compensation for any loss or injury that the company's negligence caused, with power to add punitive damages, under clause (d), and adequate costs under clause (m). On the two 2026 orders, which it picks turns on the state of the work and on whether the company defends.
On our reading, a realistic claim for installed work that does not match the renders is the independent cost of making it match, compensation you can explain, and costs. A full refund fits work that is unusable or unsafe, and even then expect questions about the fittings left in place. Compensation in the two orders was Rs 50,000 and Rs 1 lakh, and the Hyderabad per-day delay claim under the website terms was not awarded.
What evidence do we need before we file?
Documents that show what you approved, what you paid and when, and what was built. Section 38(6) says complaints are heard on affidavit and documentary evidence, so the file you build now is your case. The Hyderabad exhibits make a checklist: bank extracts with each payment's reference number, the proposal and e-sign documents, the website extract showing the completion date, the website terms, the e-mail thread, WhatsApp chats, the legal notice with postal receipts and tracking reports, and photographs with a pen drive of the site. The Livspace homeowner also filed survey reports.
Add two things of your own: the approved renders, with the message approving them, beside a photograph of each installed unit from the same angle, and an independent, itemised estimate from another interiors firm, an architect or an engineer of what rectification and finishing will cost. In Hyderabad that estimate became the award because the company put forward no figure of its own.
In our experience it is the paperwork, not the law, that sinks interiors claims. Families approve renders on a video call, pay on a WhatsApp request and sign production drawings weeks later without comparing them with the renders. Others accept months of promises that the carpenter will come next week, with no written date, or let a new contractor dismantle the units before anyone photographs them. And many complaints claim large sums for delay and agony from a website clause, when a Commission may work from the cost of putting the work right.
Where do we file in Bengaluru, and by when?
For a contract of Rs 10 to 15 lakh, you file in the District Commission, on e-Jagriti, within two years. The forum goes by what you paid, not what you claim. Sections 34(1), 47(1)(a)(i) and 58(1)(a)(i) use "the value of the goods or services paid as consideration", while the Jurisdiction Rules of 2021, G.S.R. 912(E) of 30 December 2021, fix the bands. Rs 50 lakh or less goes to the District Commission, more than Rs 50 lakh but not more than Rs 2 crore to the State Commission (for a Bengaluru home, the Karnataka State Commission), and more than Rs 2 crore to the National Commission. So the Hyderabad complaint, on about Rs 12.75 lakh, was a District Commission case under section 35, and the Livspace complaint, on Rs 71.62 lakh, a State Commission case under section 47.
Territorially, section 34(2) opens the District Commission where the company has a branch office or carries on business, where all or part of the cause of action arose, or in the district where you live or personally work for gain, so a company with its head office in Delhi or Mumbai can be sued in Bengaluru. Section 35(1) allows electronic filing, now on e-Jagriti. The Department of Consumer Affairs launched it on 1 January 2025, folding in e-Daakhil, and it offers OTP registration and online or offline fee payment. The fee, under the table substituted in August 2023, is Rs 400 where you paid more than Rs 10 lakh but not more than Rs 20 lakh.
Deadline warning. Section 69 sets a two-year limit that starts when the cause of action arises. A late complaint can be admitted only on sufficient cause, with the Commission's written reasons for condoning the delay. Never assume promises to redo the work move the start date: count from the promised completion date or the day the mismatched units went in, whichever was earlier.
The Karnataka route, in four lines.
Forum by price paid
Rs 50 lakh or less paid goes to the District Commission. The State Commission takes payments above that up to Rs 2 crore, whatever compensation you claim.
Your home district
Section 34(2) also allows a complaint where you live or personally work for gain, so a company based elsewhere can be sued in Bengaluru.
Rs 400 to file
Where the price paid is more than Rs 10 lakh but not more than Rs 20 lakh, the filing fee is Rs 400, payable online on e-Jagriti.
The two-year limit
It starts when the cause of action arises. After that, a complaint is admitted only on sufficient cause, with the Commission's written reasons.
What should we send the company this week?
A written demand listing each deviation, then a legal notice, then the complaint. Section 35 does not require a notice first, but both 2026 homeowners sent one, and a short deadline fixes the date of refusal and records the company's answer or silence.
- Save the full e-mail and WhatsApp threads, the quotation, the renders, the contract and production drawings, and bank statements for each payment.
- Photograph and video every unit beside its render before anyone touches the work.
- Get an itemised rectification estimate from an independent interiors firm, architect or engineer.
- Write to the company's registered office and the branch you dealt with, listing each deviation, the promised date and the payments, and ask for rectification by a fixed date or the estimated cost.
- Do not sign a handover or completion form as it stands. If you must, write the defects above your signature and keep a copy.
- If the company refuses or goes quiet, send a legal notice with a short deadline and keep the postal receipts and tracking reports.
- File on e-Jagriti before the District Commission, with an affidavit of evidence and your documents, well inside the two years.
Frequently Asked Questions
Do we have to give the company a chance to fix the work before we complain?
The Act's provisions on filing a complaint do not make it a precondition, but a written demand with a deadline shows the company had its chance and fixes when it refused. The Hyderabad homeowner's legal notice gave seven days. If the company starts rectifying, record what was done and when.
The designer who promised us the design has left the company. Who do we complain against?
The company, and every company named on the quotation, contract and invoices. In the Hyderabad case the company's own e-mail said the designer was no longer in its system, and the three opposite parties were still held jointly and severally liable. The Maharashtra order faulted the company for replacing designers without the homeowner's consent.
Can we get another carpenter to finish the work before we file?
Yes, if you cannot wait, but document first. Photograph and video every unit against the renders and get an independent itemised estimate before anything is dismantled, then keep the new contractor's quotation and bills. On our reading, those bills become evidence of what putting the work right cost.
Can we claim the rent we paid while the flat was not ready, or the electricity and maintenance charges?
You can claim them as loss caused by the company's negligence under section 39(1)(d), but you must prove them with bills and connect them to the delay. The Hyderabad homeowner claimed Rs 36,000 in electricity charges paid under her agreement with the builder. The order did not award that as a separate item and gave Rs 50,000 as compensation.
The company's head office is in another city. Can we still file in Bengaluru?
Yes. Section 34(2)(d) allows filing in the District Commission where you live or personally work for gain, and section 47(4)(d) gives the same choice for the State Commission. On our reading, where the work was done in your Bengaluru flat, the cause of action also arose there, which section 34(2)(c) recognises.
Will the Commission order a full refund?
Not necessarily. The ex parte Maharashtra order returned the whole Rs 71.62 lakh where the work was unsafe and unfinished and the company never defended. The contested Hyderabad order gave Rs 3.5 lakh, the cost of rectification, on a price of about Rs 12.75 lakh. Expect the measure to follow the state of the work and the evidence.
What if the company does not pay after the order?
Section 71 lets the Commission enforce its order as if it were a civil court decree, and under section 72(1) failure to comply can be punished with a prison term of between one month and three years, a fine between Rs 25,000 and Rs 1 lakh, or both. The Hyderabad order also carried interest at 9 percent on the Rs 3.5 lakh from filing if the company missed its 45-day deadline.
How long does a complaint take, and what does it cost?
Section 38(7) sets a target of three months from the date the company receives notice, where no testing is needed, but contested cases take longer: the Hyderabad complaint, filed in 2025, was decided on 3 September 2026. Allow, as an indicative range, one to two years before the District Commission if the company fights the case. The filing fee is Rs 400 where you paid more than Rs 10 lakh but not more than Rs 20 lakh.
This article is for general informational purposes only and does not constitute legal advice. Consult a qualified advocate for advice on your specific situation.






